From the President of the Company. The Company is pleased to announce that it has successfully completed its wildcat well on the Gunnar Dome prospect. As previously announced, the Company made the decision to test multiple zones in the well to have a better understanding of the localized geology with regard to future drill locations. A total of seven zones were perforated, tested, then squeezed off and bridge plugs were set to ensure complete closure. Many of the zones had gaseous mixtures which the McCauley processing plant is not currently set up to extract. The two sections which were perforated for production are within the same geologic formation and are separated by an impermeable layer with similar pressure. Both zones were perforated in a manner to stay within an area of only connate formation water values. Water-free or near-water-free Helium production is a continuing Company goal.