The B.C. Energy Regulator (BCER) is investigating after Coastal GasLink (CGL) reported two spills of clay lubricant while it was tunnelling under the Morice River to build a natural gas pipeline through northern British Columbia. The area around the Morice River has for years been the site of conflict between Wet'suwet'en hereditary chiefs and supporters, and CGL, its workers and the RCMP.
What is the hose along Highway 35?
Drivers had something new to observe on Highway 35, this past week, at the point informally known as Hopper’s Hill, featuring the Omineca Ski Club at the base. A long hose was unmistakably strung out along the long incline. It is at least six kilometres in length. It was a topic of watercooler chatter since it appeared. It was natural to surmise that it had something to do with the industrial activity not too far beyond the apex of the hill. That’s where the installation work is being done to build the natural gas pipeline through the area.