After a 3 1/2 year study, the International Souris River Study Board has released its draft report and recommendations for public comment. The report, “Managing Water Supply and Flood Control in the Souris River Basin,” recommends potential reservoir operation options to improve flood control and water supply. The International Joint Commission (IJC) established the Study Board in 2017 in response to a request by both the Canadian and United States governments. This request was precipitated by the flood in the Souris River basin in 2011.